Behind The Scene Weekly (in blue) Progress Reports" What has Daniel been up to? Not everything can be listed, but its close. Shop-Closed on Mondays unless otherwise noted.
Customer drop in's- -Nov 9th-2/10th-3/11th-1/12th-
........Computer issues.............'''
-Server down or computer problems
-Oct-29thA*-Earth link agent repaired Computer/Nov-1st-3rd-pop up issues remains/ 3rd-6th-12th~^^ Daniels computer still not working correctly
Auto Sales work
-Oct-9th-11th-none
Salvage Parts for recycling & Store resale vehicles and parts Oct 31st-Nov 1st-8thnone/9thB*/10th-11th-none/12thAXX(weather)-working with DMV State Inspector
vehicles already off property
- (Junk)-Sept 30thB*-Gold Bonneville-
- (Reconditioned & Sold)-Oct 4thA*-White Impala-
- (Junk)-Oct-1stAB*-Red Camry-
- (Abandoned)-Oct 29thC*-Red Ford SHO
- (Abandoned)-Nov-10thA*-72 Green Chevy Truck
Tow vehicle load & Unload-Oct-9th-12th-none
--Office work, Paying Bills, Estimates, Car part-Research,Phone calls, Credit Cards, Post office or Bank work-
-Nov-9thAC*/10th-ABC*^/11thABC*^/12thA^^
-Customer Handyman services (electrical work, carpentry, plumbing etc..) -Nov-9-12th-none
-Move a vehicle or trailer in or out from storage
- Nov-9th-none/10thA*-Wow-Ken almost didn't keep a promise-moves 72 chevy truck/11th-none/
-Shop for items,pick up auto parts, Return items , etc..
Nov-9thAB*-Voyager/10th-C*-Tires & Groceries/11th-none
Deliveries or pick up a vehicle with customer
-Nov-9th-10th-none/11thB*shop car/12th-
Recycling collecting work- -
- Nov-9th-11th-none
Recycling drop off or work-
-Nov-9th-11th-none
Web site updates
Nov-9thB*/10th-11th-none/12thA*
Organize home or Organize Shop, Pick up tools-
-Nov-6th-none/7thABC*-shop/8thAB*-home/9th-none/10thC*-11thC*-Home
- Equipment & Property repairs since 2/6/09 C.A.R. inc FREEZE OUT (red) Sept-26th-add more levels to shelf on body shop (SR & JR) /28th-none/29th-(SR)-Finish levels on shelf for 36 Plymouth parts
Air compressor repairs- March 20thA<>/ May 3rdB/June 17thA*^/ Still broken. Move & set up blasting booth October 19thABC*^(JR)/ 20thABC*^(JR)(SR)/21stABC*^(SR)(JR)/22ndABC*^(SR)(JR)/23rdAB*/ 24thABC**(SR)(JR)Pick up areas
New water lines, Have heat repaired in shop 2/25/09 Hot water heater replacement- April 6thC*/
16thAB*^/21stC*^/26thBC**
Save elements April 6thC**
Disposal of water heater-April 6thC**
Add calcium to water softener May 13thC**
Add additional Copper water lines up & downstairs-
April 8thAB*/18thAB*/19thABC*/21stC*^/26thBC**
Fix leaking water valve upstairs- April 17thB*^/
18thAB*^/Bowl to tank-June 8thB*^-still leaks a little
Replace both lids-April 6thB**/ Oct-28thA* Fix leak
wood work and drill through stud work- April 8thC*/18thABC*^/19thABC*/20thC*^/ May 1stB*(SR)/June 2ndAB*^(SR)&(JR) /build access door to roof-winter proof bathroom- September-26thBXX/Installed-29thABC** Construct wooden Meter reader enclosure and Install around Meter-Oct-4thBC*^- Roof Repairs adding new Tin- and ledger board-October 19th-22ndAB*^ /23rdB**-(Carpenter Tom's crew of 3)
Clean Paint Booth & air hoses-1stB*^/
shop air lines- 1stC*^/
Bring wood stove upstairs-Too HeavyXX
Install New irrigation system-21stAB**
Patch up siding on front garage doors-April 6thB** (SR)/Fix damage Tin roof June 27th**(JR)/ Oct 13thB**-Move New Tin roofing
Repair or replace light fixtures in shop- April 16thB** Oct-6thB**(SR)&(JR)-Replace one Body shop Ceiling lamp assembly & bulbs/ Oct-9thB^^/10thC*^/11thA*^13thB**-Cut out and Install boxes for Fire Extinguishers, sheet rock work, Install fire alarm.
Install New phone & lines - April 29thC*^/30thBC*^ /May5thAB*^/12thB**
ll wiring downstairs-April 5th-6th**/New outdoor light fixture-June 8thB**/ July 19thB*^-100ft ethernet cable/ 21stBC!!!-Wrong Cable, had to pull it out of wall. Need Cat 5 wire not 6-what a pain!!!/ 22ndB* obtained the correct wire, 24thAXX/26thA**thread it through the walls, floor again and it works
Cut Trees,cut and stack wood-April 4th* (jr)/11thA*(Sr)/16thB*(Sr)/May 9thABC*(JR)/ 12thBC*^ (jr)/13thC*^(jr)/15thBC*^(JR)/16thB*^(jr) /18thBC* (JR)/19thB*(jr)20thB*^/21stC**/22ndA*^/28thC*^/
June2ndA*^(SR&JR).
July 6thB*^-Alex & Daniel/9thC*^(JR)/13thC*^(JR)/ 23rdA*-move rose bush from sales lot/Oct-19thA*^-more trees
Pole & Sign work April 24thB*/29thB*^/May 5thA*^/ 13thB*^/ 19thBC*^/20thABC*^/21stBC*^/ June2ndB*^/June27thA*^/July7thC^^/10thA*^/18thB*^/
Fence or Gate work-June20thC*^/27thC*^/23rdC*^/ Aug 3rdC*^/ 10thAB*^/17thAB*^
Clean out gutters-June21stC*^/
Pick up junk outside of garage and move stuff/ June13thC*^/16thABC*^/Oct 2ndB*/3rdB*/4thA*/ Empty out storage & organize shed's Nov-1st-AB*^/3rdABC*
-Knee operation -Pending
Property maintenance-Cut grass June 18thA*^/26thA*^/ 29thAXX/July2ndAXXm Trim bushes next to driveway, remove low branches on trees blocking views/July7thCXX/ 13thC*^-Trim/24thAB*-Cut grass/Aug17thA*/18thC*/19thC*+(sr) /Oct-3rdB*/29thB*-Nov-1stBC*^/5thC*/7thC*/9thC*^Fall work with leaves off driveway-walkways
This is used for a guide to understand what symbols we use:
-
= one icon per person where we are located in progress reports
- ~ = Planning to work on. area
- ^= Currently working on.
- += required work on a daily basis.
- *^= some progress areas finish for that day, will be working on the following day.
- ~^= Planning about working in the last area of repair for the following day.
- * = Finish a particular area for that day.
- XX = Canceled Plans.
- !!!= Unexpected problem that took us away from project for that day.
- ## waiting for customers reply.
- /= slot between two days.
- (HOLD) = The project has stopped by owners request or there is lack of funds for project to continue.
- <>= Conflicting issues and could not finished a particular area for that day.
|