Behind The Scene Weekly Progress Reports" What has Daniel and Daniels help been up to? Not everything can be listed, but its close. Shop-Closed on Mondays unless otherwise noted.
Customer drop in's- -September18th-0/19th-20th-0/21st-2/22nd-2
........Computer issues.............'''
-Server down or computer problems
-Sept-18th-22nd-seems ok
Auto Sale work
-Sept 18th-B*-Start and run Impala/19th-22nd-none
Tow vehicle & Unload-Sept 18th-none/19th-A*-set up tires/ 20thAB*-69 Bug/21stAB*-unload, Pick up 87 Toyota & Unload/22nd-none
--Office work, Paying Bills, Estimates, Research,Phone calls, Credit Cards, Post office or Bank work-
-Sept18thA*/19th-20th-none/21stA*/22ndABC*/
Parts Reports are now listed in the auto progress reports pages...
-Move a vehicle or trailer out from storage
- Sept 18th-none/19th-20th-none/21stB*-Moved several vehicles/22nd-none
-Shop for items,pick up auto parts, Return items or drop off an item etc..
Sept 19thA* unload van of used trashy furniture/20th-donation centers/21stB*-Pin for trailer 22nd-none
Deliveries or pick up a vehicle with customer
-Sept 19th-22nd-none
Recycling collecting work- -
- Sept-18thB*-Plastic,Furniture/19th-none/20th-donations/21stB*-More junk funiture/22nd-none
r-Recycling drop off or work-
-Sept-15th-18th-none/19th trashy furniture-1st load/22ndC*-2nd load
Web site updates
Sept-18thAC*/19th-20th-none/21stAC*/22ndC*
Organize home or Organize Shop, Pick up tools-
-Sept18thBC*-body shop & Grey tent/19th-none/20thA*-office/21stAB*Removing remaining stuff & organize elsewhere/22ndAB*-More shop clean up & remove steel shelfs from gray tent. Gray tent organized, bring shelf in body shop to ad more shelves to it to store more parts for 36 Plymouth
- Equipment repairs 16th-18th-none/19thA*weld small winch bracket to Car dolly/20th-22nd-none/
Build back up business at AutoFashions.com & Property Repair work since 2/6/09 Carolina Auto Restorer's Inc FREEZE OUT-Sept 22nd 2009-No plans
Shop air compressor repairs- March 20thA<>/ May 3rdB/June 17thA*^/ Still broken
New water lines, Have heat repaired in shop 2/25/09 Hot water heater replacement- April 6thC*/
16thAB*^/21stC*^/26thBC**
Save elements April 6thC**
Disposal of water heater-April 6thC**
Add calcium to water softener May 13thC**
Add additional Copper water lines up & downstairs-
April 8thAB*/18thAB*/19thABC*/21stC*^/26thBC**
Fix leaking water valve upstairs- April 17thB*^/
18thAB*^/Bowl to tank-June 8thB*^-still leaks a little
Replace both lids-April 6thB**/
Sheet rock, wood work and drill through stud work- April 8thC*/18thABC*^/19thABC*/20thC*^/ May 1stB*(SR)/June 2ndAB*^(SR)&(JR)/build access door to roof-
Clean Paint Booth & air hoses-1stB*^/
shop air lines- 1stC*^/
Bring wood stove upstairs-Too HeavyXX
Install New irrigation system-21stAB**
Patch up siding on front garage doors-April 6thB** (SR)/Fix damage Tin roof June 27th**(JR)
Repair or replace light fixtures in shop- April 16thB**
Install New phone & lines - April 29thC*^/30thBC*^ /May5thAB*^/12thB**
ll wiring downstairs-April 5th-6th**/New outdoor light fixture-June 8thB**/ July 19thB*^-100ft eithernet cable/ 21stBC!!!-Wrong Cable, had to pull it out of wall. Need Cat 5 wire not 6-what a pain!!!/ 22ndB* obtained the correct wire so I can accept credit card processing in shop/ 24thAXX/26thA**thread it through the walls, floor again and it works
Sales Lot-Cut Trees,cut and stack wood-April 4th* (jr)/11thA*(Sr)/16thB*(Sr)/May 9thABC*(JR)/ 12thBC*^ (jr)/13thC*^(jr)/15thBC*^(JR)/16thB*^(jr) /18thBC* (JR)/19thB*(jr)20thB*^/21stC**/22ndA*^/28thC*^/
June2ndA*^(SR&JR).
July 6thB*^-Alex & Daniel/9thC*^(JR)/13thC*^(JR)/ 23rdA*-move rose bush from sales lot
Pole & Sign work April 24thB*/29thB*^/May 5thA*^/ 13thB*^/ 19thBC*^/20thABC*^/21stBC*^/ June2ndB*^/June27thA*^/July7thC^^/10thA*^/18thB*^/
Fence or Gate work-June20thC*^/27thC*^/23rdC*^/ Aug 3rdC*^/ 10thAB*^/17thAB*^
Clean out gutters-June21stC*^/
Pick up junk outside of garage and move stuff out of site/ June13thC*^/16thABC*^
Right Knee operation-Pending
Property maintenance-Cut grass June 18thA*^/26thA*^/ 29thAXX/July2ndAXXm Trim bushes next to driveway, remove low branches on trees blocking views/July7thCXX/ 13thC*^-Trim/24thAB*-Cut grass/Aug17thA*/18thC*/19thC*+(sr)
This is used for a guide to understand what symbols we use:
-
= one icon per person where we are located in progress reports
- ~ = Planning to work on. area
- ^= Currently working on.
- += required work on a daily basis.
- *^= some progress areas finish for that day, will be working on the following day.
- ~^= Planning about working in the last area of repair for the following day.
- * = Finish a particular area for that day.
- XX = Canceled Plans.
- !!!= Unexpected problem that took us away from project for that day.
- ## waiting for customers reply.
- /= slot between two days.
- (HOLD) = The project has stopped by owners request or there is lack of funds for project to continue.
- <>= Conflicting issues and could not finished a particular area for that day.
|