Weekly (in blue) General Progress Reports- "Scroll Down Page"
An overview on what Daniel and help have been up to ! Not everything can be listed, but its close. This page provides now a view for catch all progress reports. Customer can view their entire progress reports from start to present date located in the progress report page of our website by their user names and passwords.
*06-29-2011At the present time a new building has been built by a contractor. When I can move all the cars that can be fit in the new building only than can I work much faster to finish what has already been started. Shops Phone 919-542-5566
Treasures & Gift Shop -Is Now open! There is a small glass display of art for sale at the shop -Tuesday-Saturdays 9.00am-7:00pm E.S.T. Including Holidays.
This guide is used for understanding what symbols Daniel uses on his website:
-
= one icon per person where we are located in progress reports
- ~ = Planning to work on. area
- ^= Currently working on.
- += required work on a daily basis.
- *^= some progress areas finish for that day, will be working on the following day.
- ~^= Planning about working in the last area of repair for the following day.
- * = Finish a particular area for that day.
- XX = Canceled Plans.
- !!!= Unexpected problem that took us away from project for that day.
- ## waiting for customers reply.
- /= slot between two days.
- (HOLD) = The project has stopped by owners request or there is lack of funds for project to continue.
- <>= Conflicting issues and could not finished a particular area for that day.
- PT=Part Time
Customer Parts Order - June-22nd-0/23rd-0/24th-0/25th-0/26th-0/27th-0/28th-0/29th-0
Shipping History to and from Auto Fashions.
June-22nd-0/23rd-0/24th-0/25th-0/26th-0/27th-0/28th-0/29th-0
Customer or helper drop in's June-22nd-0/23rd-0/24th-0/25th-1/26th-0/27th-0/28th-0/29th-0
Worked on personal or customers vehicle or item- June-22nd-BXX-Instead start up Debbies Van, clean up and organize the remaining tools in 98 Plymouth//23rdB*weld up Sams Hood for Chevy Truck and Install Debbies passenger seat in Van add storage items/24th-B*-Sam-PT/25th-0/26th-Organize storage metal building/27th-B*-Remove window regulator out of Nissan Maxium and prop up window by owners request/28th-AB*-replace ceiling fan/29th-0
Tow vehicle or load & Unload
June 22nd-0/23rd-0/24th-0/25th-0/26th-0/27th-0/28th-0/29th-0
-~~60 Corvair
+Office work including: Bank work,Managing Receipts,Invoices,Taxes,Business Meetings,Research,Out going phone calls, Pay bills,Court work
-June-22ndA*-paying bills and office clean up/23rd-C*-post office/24th-0/25th-0/26th-Office clean up/27th-Office work/28th-0/29th-AB*-office work
Handyman services (electrical work, cut trees, dig holes, grass or pick up leaves,carpentry, plumbing etc..) June 22ndBC*-Clear path and make a new temporary road through the woods/23rd-0/24th-0/25th-0/26th-0/27th-C*-remove broken ceiling fan upstairs/28th-AB*purchase and install ceiling fan/29th-0
Clean up property at Auto Fashions Shop Or Pick up tools June 22nd-0/23rd-C*-pick up and organize metal storage building/24th-0/25th-0/26th-Pick up tools & organize shop/27th-Pick up tools & organize shop/28th-0/29th-0
-Shop for items,pick up auto parts, Return items , etc.. - -June 22nd-0/23rd-0/24th-0/25th-0/26th-0/27th-0/28thA*-ceiling fan/29th-0
Recycling, collecting & work- - June 22nd-0/23rd-0/24th-0/25th-0/26th-0/27th-0/28th-0/29th-0
Recycling drop off -
June-22nd-0/23rdB**-plastic,mix paper,tin,and glass and trash/24th-0/25th-0/26th-0/27th-0/28th-0/29th-0
Personal: Home Arrons,Clean up, Emergency's,Doctor ,Vet appointments ,or getting home groceries June 20thA*-Home arrons/21st-0/22nd-Home arrons/23rd-C*-groceries/24th-0/25th-Home Arrons/26th-Home arrons & Clean up/27th-Home arrons/28th-0/29th-B*-Home arrons
- Equipment or tool repairs June 22nd-0/23rd-0/24th-0/25th-0/26th-0/27th-0/28th-AB*- living room ceiling fan was replaced/29th-0
~~Sams red chain saw
~~ work on Army Compressor and fittings on lines
~~Overhauling 10 ton ram that is leaking(used for body work) ~~Shop Paint Booth Compressor that has been broken for awhile-needs capacitor's since nightmare of 2009 ~~Heat downstairs when out again ~~Finish cutting and stacking down trees ~~ Stump grinding work inside new building area ~~washing machine needs repair-works only in delicate cycle ~~water softener needs more calcium
Vehicles already off property or stored in buildings.
- (Junk)-Sept 30thB*2009-C.R's Gold Bonneville-(1)
- (Reconditioned & Sold)-Oct 4thA*2009-White Impala-(2)
- (Junk)-Oct-1stAB*2009-Don's Red Camry-(3)
- (Abandon)-Oct 29thC*2009-Bill's Red Ford SHO-(4)
- (Abandon)-Nov-10thA*-Ken's 72 Green Chevy Truck(5)
- Ken's (abandoned) personal non-automotive stuff that was outside
- Ken'(junk)Dec12thB*-Camero-(6)
- Ken's (junk) Dec12thB*-Ford Truck-(7)
- Daniels old tires-Jan 1stC*2010-Moved all from woods and stack under storage
- Jean's Personal stuff completely removed inside 93 Gold caravan Jan 8thB*-11th 2010
- Jeans(abandon) 93 Gold Caravan Feb-4thB*-(8)
- Daniel's AFTC-(Gave to Ken)-92 White Ford SHO-Feb-19thB*-(9)
- C.R's-(Returned)94 SAAB-March 9thB*-(10)
- C.R's Disassembled (Returned)Saab Engine March 12thB*
- Kim's (Retured)Motorcycle's March 27thC*-photo showing one,but added the other one later.-(11)
- Stephanies (Returned)Honda Accord April 4th,-(12)
- Kims parts(Returned) 86 camry parts car April 4th-(13)
- Maureens (customer) 69 beetle April 5th-(14)
- April 8thAB*-(abandon)Kurts old 82 blue subaru (15)
- April 8th A*-(customer)Toni's 97 Ford Taurus(16)
- April 21stB*-(Junk) Glen & stephanies 78 honda blue station wagon parts car(17)
- April 21stA*-Williams 83 (abandon) silver Subaru wagon(18)!
- April 22ndAB*-Daniel's clean (junk) metal scrap pile near woods, old fenders hoods,etc..
- Daniel's(junk) Dec09-26thB*& April 27thB*-Rotted wood & Aluminum Old Popup Camper body.
- Daniel's (restorable,but junked) May 6thB * Brown 77 Honda Civic Cvcc(19)
- Daniel's(good used engines and parts) May 7thB*near school bus now gone!
- Daniels ( For Sale vehicle)May 11thB*-92 Ford F-150 (20)( move to another property for storage).
- Daniels (Sold & Towed away) May 14thB*- 91 Black Nissan Stanza(21)
- June 2ndC* Kims (customer) 86 Nissan Truck (22)
- June 4thB*87 (Sold w/I.O.U.& Towed away) White Toyota Camry(23)
- June 8thB*-62 Green VW Beetle (Trade & Towed away)(24)photo lost on 11th
- June 15thC*-97 Black Dodge Avenger(25)(Towed to another property for storage)
- June 17thC*-Barry's (customer)49 Chevy pick-up truck (26)
- June 18thB*-Daniel's (used good bikes from storage, used radiators and more scrap metal)
- June 23rdB*-Daniel's( Too rusty, so it was Junked) 80 Subaru (27)
- July 14thB*-Daniel's -(Gone)Old Aluminum gutters,storm window frames, other Aluminum parts14th
- July 28thC!!! one storage building 88% completed for-55 Buick Parts Car-Did not pass with inspector so car will be removed and replaced it with smaller vehicle
- July 31st,2010 Getting licensed Contractors Bids for building a pole barn three sides and a roof
40-50' to cover the remaining vehicles so I can get back to customer cars! /31stB*-cut trees at new location/
- Aug-1st-none/2nd-none
/3rdABC*-Cut grass & clear more trees, push old stumps with loader/Aug-4thXX /5thABC-6thABC*^-Cut more small trees and push more old logs in piles in woods /7th-none/8thC*-Cut more trees,push more logs/9thC*-Move more logs /10thC*-Cut and move more logs, trim roadways down to road /11thA*-Move already cut logs into loader, my father helps today until it got too hot to work outside/12th-13th-none/ -15th-none /16thABC*-Cut grass,more small trees/17th-none/ 18thB* line up a contractor to build building. 20-25th-taking care of legal issues with planning department,environment,Building inspector/ 26thA*-measured area I need to clear additional 10 feet of tree line than this area will be done/27thA*
- 31st-waiting for building inspector, Engineering results
- Sept 2nd-I had to repo 87 Toyota Camry(-1=26)
- Sept 7thA*-Half only, stored the other half--Billy's Blue T-boned 280z(27)
- Sept-14thA-Had to bring back 97 Dodge(-1=26)
- Sept 22ndAB*& Sept 27thBC* Pauls 74 Red junk Ford Pinto parts car-Rear only, Front half enclosed(27)
- The rest of the vehicles I'm planning on storing for resale!
- October 27th, 2010-New Building begins with contractor
- November 1st-2010-I have started to work at the shop,PT work to make ends meet and continue to repair things that I could not repair because of the zoning ordinance and greedy X-Business partner.
- 04-11-2011-Move one into new building and position in its place.(28)
- 04-19-2011-Move three smaller vehicles into new building and move another back in shop(32).One was put into position in shop,three need positioning in new building.
- 04-26-2011, Two More were added to building, but they also need positioning in building.(34).
- 04-27-2011-Bring in another vehicle, position three that were already in building (35).
- 05-05-2011-Move 97 Dodge Advenger in building, but it is not positioned yet (36).
- 06-12-2011-94 Kims 94 Gold Nissan stanza (Customer vehicle) has be picked up (37).
- 06-12-2011-Daniel's 71 Karman Ghia has been move to storage (38).
- 06-18-2011-Daniels 68 Datsun wagon and 74 Plymouth in storage (40)
- 06-20-2011-Daniels three MGB's (43)stored in building,but not positioned yet.
|