02-06-2009 Dissolving begins at C.A.R.inc 02-26-2009-Drive to location to view vehicle. 02-27-2009-I Picked up vehicle and place in storage at Auto Fashions to start the evaluation for restoration. The owner said the engine has already be rebuilt and the transmission is in good working order. The body and the interior will be restored, followed by a minor work on engine. Vehicle is in storage 03-27-2009-C*-Thank-you for your Deposit # 6139 04-01-2009-B* Picked up shop manual & parts manual for vehicle. 05-29-2009-B*After the 99 Jeep is finished today I plan on raising the vehicle and remove the brake drums to inspect the brakes 05-31-2009-Upload photos. The brake shoes are in good. The brake parts do look new, but further inspection is needed to see if brake cylinders can be honed out. The wheel bearings and the drums have not been checked for out. 06-04-2009-~XX!!!-Removing brake master cylinder.~~Planning these operations on Saturday since plans changed on the 4th & 6th 06-06-2009-Photo Update 06-19-2009-A*-Buying supplies & Setting up new shelves in mechanic shop to hold parts removed for your vehicle, no charge for this 06-25-2009-B* Removed the brake master cylinder and disassembled it. 06-27-2009-B*-Remove the hood from vehicle. Remove on driver side: Both front and rear door handles, Inner door handles, window handles, Both garnish moldings, trim panels, door regulators, both door glasses. The left rear door has body damage that is hidden by body filler circled by a red line. Previous body shop person did not do a very good job of roughing out the sheet metal, rather just fill in with filler. There are signs of Holes that were drilled in rear door panel, not sure if you can see the damage in photo through the inner left rear door, about 30 or so holes were drilled. The sheet metal will need a lot of roughing out later. All parts were labeled and placed on shelves. 07-02-2009-A*Brake master cylinder is currently being hand delivered to machine shop 07-09-2009-BC*-Removed parts that were mention on 6/27/09 report, but on passengers side 07-10-2009-Photo update 07-13-2009-Picked up check #6124,Finishing up Invoice #2- Thank-you ~planning to work on removing windshield, removing quarter and rear glass
This is used for a guide to understand what symbols we use:
= one icon per person where we are located in progress reports
~ = Planning to work on. area
^= Currently working on.
+= required work on a daily basis.
*^= some progress areas finish for that day, will be working on the following day.
~^= Planning about working in the last area of repair for the following day.
* = Finish a particular area for that day.
XX = Canceled Plans.
!!!= Unexpected problem that took us away from project for that day.
## waiting for customers reply.
/= slot between two days.
(HOLD) = The project has stopped by owners request or there is lack of funds for project to continue.
<>= Conflicting issues and could not finished a particular area for that day.
Image:
Auto Restoration, Auto Parts Auto Sales. Home Decor & Gifts
Website design, website editing, photography work, written reports, video work.
Founder of the Chatham Socials, C.A.R.Club, and organizer of The Chapel Hill Dining Group by: Daniel at AutoFashions.com
Volunteer work -Debbie when available.
Autofashions.com has been established online Since 2000 Offline since 1979. Copyrights° 2009